loading

FUGA

ArchitectureIndustrialQuebec Region
Fuga
David Boyer
  • Completion period
    2019 - 2021
  • Budget
    $2.5M
  • Area
    700m²

Stoneham-et-Tewksbury, a town nestled in the wooded hills north of Quebec City, is the site of the FUGA cannabis production plant. The facility combines production, drying, shipping and research.

Fuga
David Boyer

The stakes are high for such a sensitive facility. In addition to the high safety and hygiene measures governing logistics, the plant must be designed to maintain and withstand the high levels of humidity required for production.

Fuga
David Boyer
Fuga
David Boyer

A technical project, but also a responsible one; an approach that makes perfect sense in a preserved natural context where felled trees have been replanted. From multiple energy sources to water management, the plant is a sustainable part of the municipal landscape.

Fuga
David Boyer

To come